Define simulation settings

Define the base unit to be used in simulation results and for time and cost parameters.

  1. In the toolbar, click .

  2. In the Settings pane that opens, select the base time and cost units from those available.

  3. Click Save.

The simulation settings panel allowing to define the base time and cost units